Hi,
I am in the process of buying a house off the plans and am a little overwhelemed by the process. It would be great if someone could tell me the order in which things should happen. At what stage do I tell them what extra sockets/fans in bathrooms etc I want. Is it before/after signing contracts? The house is at foundation level and at the rate they are going, the walls could be up in a month. Also to get sockets etc added, do I do it through an engineer or who do I get to mark out desired locations for the changes on the plans? I assume that changes to electrics etc can be done even after the house reaches roof level?
Thanks
I am in the process of buying a house off the plans and am a little overwhelemed by the process. It would be great if someone could tell me the order in which things should happen. At what stage do I tell them what extra sockets/fans in bathrooms etc I want. Is it before/after signing contracts? The house is at foundation level and at the rate they are going, the walls could be up in a month. Also to get sockets etc added, do I do it through an engineer or who do I get to mark out desired locations for the changes on the plans? I assume that changes to electrics etc can be done even after the house reaches roof level?
Thanks