shulgin1000
Registered User
- Messages
- 43
Bit of a 'how longs a piece of string' question..difficult to quantify but maybe someone can tell me what to expect ...
I fécked up and didnt get to the builders in time during construction - to have them put in a shower in the downstairs WC.
The plumbing is in place for the toilet and wash basin - by that i mean the pipes - not the items themselves. Walls plastered & floors finished in concrete (not tiled yet).
I am waiting for the plumber to come back with a price. He says he can do it - but its not straightforward as they need to link up with the outflow pipes from the washbasin/toilet (apparently, it would normally have had its own seperate outflow).
I'm sure someone heres been in a similar situation. Just wanted to post in case anyone has any tips/pitfall warnings about how he goes about sorting this. Also, I'm not sure how to quantify whether I will be getting value for money or not when he does come back to me with a price - as I havnt a clue about this sort of thing.
Normally, I would just get another quote from someone else - but it woud be a bit akward in this case - if this guy is doing the plumbing for the estate - and has already done some work on my house - not sure if its possible to get someone else involved?
I fécked up and didnt get to the builders in time during construction - to have them put in a shower in the downstairs WC.
The plumbing is in place for the toilet and wash basin - by that i mean the pipes - not the items themselves. Walls plastered & floors finished in concrete (not tiled yet).
I am waiting for the plumber to come back with a price. He says he can do it - but its not straightforward as they need to link up with the outflow pipes from the washbasin/toilet (apparently, it would normally have had its own seperate outflow).
I'm sure someone heres been in a similar situation. Just wanted to post in case anyone has any tips/pitfall warnings about how he goes about sorting this. Also, I'm not sure how to quantify whether I will be getting value for money or not when he does come back to me with a price - as I havnt a clue about this sort of thing.
Normally, I would just get another quote from someone else - but it woud be a bit akward in this case - if this guy is doing the plumbing for the estate - and has already done some work on my house - not sure if its possible to get someone else involved?