Hi Iggy, How much was materials or did that include materials. What is the breakdown of material costs?
I got 8 walls plastered and 2 ceilings plastered for €300, he got it all done in a day (8.00am to 15.30pm).
I supplied materials.
The cheapest quote before that was €900 and was told no way a man could get it all done in a day.
If you want his details PM me.
I'm going to ask him as soon as I can if he minds me putting his details up on the net.
**************************
Edit:-materials 1 bag of skim coat every 3 plasterboard
I used 4 bags of skim coat
Are you sure you got the right figures SLF? 3 sheets of plasterboards is only 11.5m2 and 4 bags would give you 46m2, im sure your area would be a lot more than that!!
materials 1 bag of skim coat every 3 plasterboard
I used 4 bags of skim coat
Are you sure you got the right figures SLF? 3 sheets of plasterboards is only 11.5m2 and 4 bags would give you 46m2, im sure your area would be a lot more than that!!
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?