Wow J59 that's the best price I've heard definitely going to give him a call. Tks for that, it'd be nice to know when we'll have keys to get these guys at the same time.
Bottomfeeder I'm also gonna give your dad a call re tiling.
What do you all reckon is the best order of work :
Tiling done before wood flooring is def a good idea, des kelly told me this as the moisture caused by tiling is best left to dry out before flooring is laid.
However how much wiring does the alarm need would it be best to wait till alarm is in then tiling is done so as wires can go underneath ????
I'm a bit clueless
I've relaxed on the sliding doors, just gonna get mick to take them down like you j59 (he mentioned to me he was doing this for you but said he didn't know how you'd get rid of them !!) Get the flooring done then.....I do like them (bizarre I know) get them re-hung.
Jay49er I also have big horrible scratches on the back doors. SO obvious with the sun streaming in on the morning I was there last. Thing is will they replace them at this stage ???
My snag man told me he reckoned we've got all we're going to get out of them at this stage so not sure how we find middleground or negotiate anything other than sticking our heels in and the longer the waiting goes on, my heels become unstuck iykwim.
Annpg I was thinking the same myself regards name plaque for street because until there's something I don't think postie would know what street we are.
Street lights aren't finished, fencing still around number 1, still some painting on the wall opposite j59 needs doing and I'm not sure if the rusted railings opposite me @ no 56 is coming down either.
I'm goin on hols end of Oct and would really love to get in and have house somewhat sorted but ............can it take much longer, I want in noooooowwwwwww