Another interesting debate ensues!
My understanding of this outline is that there is a case re the planning permission and a case re the building regulations, control act and the liabilities of the builder under duty of care and tort law.
Just because planning permission is needed and not sought does not exonerate the requirement to build properly.
Yes you can have an illegal development under planning law but this does not mean you automatically assume the contract is illegal and has no grounding. An illegally build structure which is built properly has a much better foundation (like it?) for a case of retentive planning permission.
If it is built illegally and build in contravention of the building regulations then the case will crumble because you should / could never get planning permission for something which is not to the regs in the first place.
Bottom line- independent architect, independent structural engineer and independent contractor should be the minimum conditions required for granting of planning permission in the future. This should be endorsed by banks, builders and planners to ensure some quality into the future.
My understanding of this outline is that there is a case re the planning permission and a case re the building regulations, control act and the liabilities of the builder under duty of care and tort law.
Just because planning permission is needed and not sought does not exonerate the requirement to build properly.
Yes you can have an illegal development under planning law but this does not mean you automatically assume the contract is illegal and has no grounding. An illegally build structure which is built properly has a much better foundation (like it?) for a case of retentive planning permission.
If it is built illegally and build in contravention of the building regulations then the case will crumble because you should / could never get planning permission for something which is not to the regs in the first place.
Bottom line- independent architect, independent structural engineer and independent contractor should be the minimum conditions required for granting of planning permission in the future. This should be endorsed by banks, builders and planners to ensure some quality into the future.