eamonn123456
Registered User
- Messages
- 483
I need to get 4" plaster coving done on two rooms.
Both rooms are rectangular, both similar size and come to a total length of coving of 104'.
Current ceiling and walls are emulsion painted and seem fairly true.
How long would it take a tradesman to fix and finish?
I was thinking about half a day?
I was quoted 800 euro including materials, which I thought was on the expensive side.
Both rooms are rectangular, both similar size and come to a total length of coving of 104'.
Current ceiling and walls are emulsion painted and seem fairly true.
How long would it take a tradesman to fix and finish?
I was thinking about half a day?
I was quoted 800 euro including materials, which I thought was on the expensive side.