I'm seeking guidance on planning permission requirements for our property. We've recently moved into an older house with a large garden and need to create separate work spaces as both my spouse and I work from home.

Our Plan:​

  • A 24m² Steeltech garden office (with electricity only)
  • A 12m² Steeltech storage shed
  • Both structures would have concrete bases
  • Both would be situated at the rear of the property
  • Even with these additions, we'll maintain a substantial garden area
  • Our neighbors are aware of our intentions and support the proposal

My Question:​

Since the combined structures exceed the 25m² exemption limit, am I correct in assuming planning permission is required?

I'm concerned about inconsistent outcomes in the approval process. I've heard stories of some people installing a garden office first, then adding a shed months later without formal approval, hoping to avoid complaints.

What would be the proper approach for this project to ensure compliance while minimizing complications?

Any idea of costs to get planning?

Thank you for any insights!

Interesting article! https://www.irishtimes.com/life-and...arden-do-i-need-planning-permission-1.4782284
 
Last edited:
We don't discuss illegal activity here.
If they apply for planning permission for the garden office and build it, they will still have their full 25sqm exemption which they can use to build the shed without applying for planning.
 
Last edited:
We recently applied for planning permission for a garden office (40sqm) and retention of a large garage that was built long before our time just to regularise it and keep our 25sqm exemption for a poly tunnel or other future structure. The architect did a design and drawings for both and did the planning application, cost was €2700.

The first thing I would do is look back through old planning applications for garden rooms in your area and see what is being rejected versus approved, you can then avoid some of the pitfalls and borrow wording from the successful ones. Watch out particularly for statements relating to garden rooms in the development plan for your area, for example they may specify that the character needs to be in-keeping with the house or obviously different, that bathrooms are strictly prohibited, that small commercial activities are supported etc. You'll usually see these mentioned in previous applications and you want to abide by them or the planner may have no choice but to refuse permission or ask for more information. Do not leave this all to your architect, they might be great at CAD drawings and less great an empathising with the position planners are in or what might resonate in previous applications that have been approved.

Ours came back asking for more information after the initial application, asking us to make it look more similar to the main house, remove the toilet etc. and once we supplied this permission was granted within a couple of weeks. We didn't actually bend on much of the requests, we just gave better justifications and more careful reference to the development plan (reference my point above about not leaving the cover letter to your architect ;) )
 