Hi,
Screed (concrete - 75mm) is in about 3 weeks now. I don't have UFH working yet so it's drying out at its own pace. I was hoping to do some tiling in next few weeks which will certainly be before the UFH is up and going (long waiting time for plumber). Does anyone know if it's OK to tile before UFH is working and if so how long would I need to leave the screed ?
This relates only to tiles. I will be using timber flooring also, but I'll be leaving that until UFH is working and storing flooring in house for X weeks to aclimatise.
Thanks
James
Screed (concrete - 75mm) is in about 3 weeks now. I don't have UFH working yet so it's drying out at its own pace. I was hoping to do some tiling in next few weeks which will certainly be before the UFH is up and going (long waiting time for plumber). Does anyone know if it's OK to tile before UFH is working and if so how long would I need to leave the screed ?
This relates only to tiles. I will be using timber flooring also, but I'll be leaving that until UFH is working and storing flooring in house for X weeks to aclimatise.
Thanks
James