My wife and I secured 320k tracker mortgage from First Active to build our house. We had savings of about 50k in addition to this. The thing is that during the build we've chosen higher spec materials than was on the tender (natural slates, geothermal heating, stone facing, etc, etc) and as a result we need about 60k more to complete the build. We're about 75% complete at this stage. Our combined income is around 120k. I was wondering if anyone else has done this before I approach my bank with the request
Thanks
Thanks