Winklefairy
Registered User
- Messages
- 1
Hi all, first post here - hoping you can help with my query:
We are planning a 2 storey extension on a semi-d we're just about to sign contracts on. We'll be applying for planning permission as the 1st floor extension does not fit in to the exempted development guidelines (It will not be 2m from the boundary on one side, but 1m.). Our architects are fairly confident that we'll have no problem getting permission, as there is precedent in our row of houses and the extension will not overshadow the neighbours. Apart from this the extension would qualify for exempted development.
My question is, would it be possible to begin construction before receiving planning permission? Or perhaps beginning once permission has been granted but before the 4 week period for objections is through? (We will have discussed plans with the neighbours well in advance of this. They already know we're planning to extend and ours is the only house in the row that isn't yet extended).
If we didn't need planning permission for that extra 1m width of the 1st floor extension we would be able to start construction at any time. If we were willing to accept the risk of digging foundations for a 2 storey extension only to be denied permission for the 1st floor part of the extension (which is very unlikely) could we start construction before planning permission allowed? Or is this strictly forbidden?
Thanks in advance for any and all replies!
We are planning a 2 storey extension on a semi-d we're just about to sign contracts on. We'll be applying for planning permission as the 1st floor extension does not fit in to the exempted development guidelines (It will not be 2m from the boundary on one side, but 1m.). Our architects are fairly confident that we'll have no problem getting permission, as there is precedent in our row of houses and the extension will not overshadow the neighbours. Apart from this the extension would qualify for exempted development.
My question is, would it be possible to begin construction before receiving planning permission? Or perhaps beginning once permission has been granted but before the 4 week period for objections is through? (We will have discussed plans with the neighbours well in advance of this. They already know we're planning to extend and ours is the only house in the row that isn't yet extended).
If we didn't need planning permission for that extra 1m width of the 1st floor extension we would be able to start construction at any time. If we were willing to accept the risk of digging foundations for a 2 storey extension only to be denied permission for the 1st floor part of the extension (which is very unlikely) could we start construction before planning permission allowed? Or is this strictly forbidden?
Thanks in advance for any and all replies!