I got a quote from for 12 panel 4.7 kwp system plus 4.8 kwp battery pack €13,353 - €3000 grant = €10353 or for the same 12 panels with a 7.2 kwp battery pack €14,998-€3000 grant = €11990. A requirement is that after the installation the BER rating must reach C3 minimum or my BER must be at least a D before installation. When I contacted a local assessor he quoted me €600 for doing a BER which seems exhorbitant.
I also got a call from Active 8 who quoted me €19,502 originally less subsidy awarded for advertising €2352 less €3000 grant .Total €14,250. On his written quote he does not seem to have written what the quote included??
Is the first quote reasonable.?I have lots of roof space. Is planning permission needed for more than 12 panels?
I also got a call from Active 8 who quoted me €19,502 originally less subsidy awarded for advertising €2352 less €3000 grant .Total €14,250. On his written quote he does not seem to have written what the quote included??
Is the first quote reasonable.?I have lots of roof space. Is planning permission needed for more than 12 panels?