No one specifies X random points in a build. The number and location of each of the lights, sockets (single, double, etc.), switches, etc. should all be specified, and a price should have been agreed in advance with that level of detail.
A double socket would be considered a single point, a light and switch would be two points.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?