S Seans Dad Registered User Messages 23 23 Oct 2007 #1 How long should you wait to commence painting once internal plastering has been completed. Is 3 weeks sufficient time?
How long should you wait to commence painting once internal plastering has been completed. Is 3 weeks sufficient time?
Y yop Registered User Messages 403 23 Oct 2007 #2 depends on a number of factors: weather, whether or not the walls were plastered then skimmed or not, if heat is on, if you have a dehumidifier or not. the longer the better lad, then paint with cheap watered down white emulsion
depends on a number of factors: weather, whether or not the walls were plastered then skimmed or not, if heat is on, if you have a dehumidifier or not. the longer the better lad, then paint with cheap watered down white emulsion
L Leo Moderator Messages 16,125 23 Oct 2007 #3 There are many threads on this topic already, including this, this, this, this, etc. I'll close this to avoid duplication. Leo
There are many threads on this topic already, including this, this, this, this, etc. I'll close this to avoid duplication. Leo