Other half and I are hoping to commence construction on our new home, 2,500 sq ft story and a half, in the coming months. We've pretty much decided that we want to go down the timber frame route, and self build the rest, by subbing out the various trades. We've received quotes from 5 timber frame companies which all very greatly, and are discovering how little we really know about the whole process. Our aim is to build as warm and energy efficient a home as possible, within the budget that we have to spend. Receiving the various quotes for the timber frame has left us more confused than ever. I'm hoping some of the many knowledgable aam contributors might be able to provide some guidance:
We need to decide between open and closed frame. There's a significant cost difference between the two, but would the extras that are included in the closed frame mean that by the time we have done all the extra work to the open frame system, installed the insulation etc, the price differential might not be so much? Can we achieve the same levels of airtightness and insulation using the much cheaper open panel system by doing the work ourselves? Would love to hear from anyone who has built using either system and opinions on the advantages/disadvantages of one system over the other.
Could anyone provide me with a basic guideline as to how much extra needs to spent to finish the house once you've paid for the timber frame kit to be erected? I know its like asking how long is a piece of string and depends greatly on finishes etc, but even a ballpark figure for things like the blockwork, roofing, plumbing, electric, 2nd fix carpentry etc would be great.
Our big issue is, we know how much we have to spend, and before we can make a decision on which tf co to go with, or which package, we need to know that say for eg our tf costs us 50k, the 120k that we have left will be enough to complete the house (have just used these figures as examples).
Please excuse my lack of knowledge on building issues, I'm on a very steep learning curve here, and as a long time lurker on aam I know there are lots of very informed and experienced contributors who might be happy to share their knowledge and experience.
We need to decide between open and closed frame. There's a significant cost difference between the two, but would the extras that are included in the closed frame mean that by the time we have done all the extra work to the open frame system, installed the insulation etc, the price differential might not be so much? Can we achieve the same levels of airtightness and insulation using the much cheaper open panel system by doing the work ourselves? Would love to hear from anyone who has built using either system and opinions on the advantages/disadvantages of one system over the other.
Could anyone provide me with a basic guideline as to how much extra needs to spent to finish the house once you've paid for the timber frame kit to be erected? I know its like asking how long is a piece of string and depends greatly on finishes etc, but even a ballpark figure for things like the blockwork, roofing, plumbing, electric, 2nd fix carpentry etc would be great.
Our big issue is, we know how much we have to spend, and before we can make a decision on which tf co to go with, or which package, we need to know that say for eg our tf costs us 50k, the 120k that we have left will be enough to complete the house (have just used these figures as examples).
Please excuse my lack of knowledge on building issues, I'm on a very steep learning curve here, and as a long time lurker on aam I know there are lots of very informed and experienced contributors who might be happy to share their knowledge and experience.