Brendan Burgess
Founder
- Messages
- 54,684
Of course for a large developer I am sure the above figures would be a lot lower, economy of scales and all that.
why is the cost of finance so high, is that just basically raising the money from the bank to build the house?
We should be thinking in terms of assembling houses, not building them. They should be manufactured in factories and assembled on site. The quality of the finished product would be far superior to the second rate rubbish churned out by our second rate tradespeople, engineers and architects.I would question the 100e per square foot, especially for the large, uniform housing estates that will probably be built. Ditto for architect fees - draw once & build x 100.
We should be thinking in terms of assembling houses, not building them. They should be manufactured in factories and assembled on site. The quality of the finished product would be far superior to the second rate rubbish churned out by our second rate tradespeople, engineers and architects.
Time and again I've been shocked with the quality of builds in the last decade or so. And the lack of parking is obscene in new housing estates.
These are the costs per house for a medium sized development. Not the cost of a one off house.
Lack of parking space, lack of gardens, lack of green areas for kids to kick a ball in.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?