I am in the middle of doing a self build, I hired a plumber based on his written quote.
He did the first fixings without any problem, and I paid him in full for the first fix.
He then came back to do the second fixings and left some materials onsite he had then added some additional charges to the quote. Even though nothing had been added nor had anything changed from when he had done the original quote. This extra charges were never discussed, nor were they ever explained they were merely hidden in the invoice.
When I called him on this, he agreed to honour his original quote. This then happened a second time after he re-issued the invoice. Just the extra cost were now on different products
He then asked for 50% of the second fix balance upfront before he would proceed with the work. I then asked for a full breakdown what work was to be carried out and what what would be left to do(this included full price breakdown).
When I added everything together I noticed that he had added an extra €2000 to the total price.
When I brought this up with him he couldn't give me an explanation a heated exchange followed.
I then met with him in person to get a full detailed explanation as to the increase and he asked me to ignore it. I couldn't get an answer from him as to why he was constantly trying to increase the cost of the plumbing.
Ultimately I called it off and asked him to remove his materials from the site and looked for another plumber. He then sent me a bill for all the materials he left on site, the value of the materials over the counter at B&Q or any other Building supply is €1500 and he is looking for €2600. So I feel even now he is trying to screw me on this.
I've offered to return the materials and pay for any re-stocking charges. My builder thinks I am mental and that this guy is simply taking advantage because he knows I'm not as hardened as a builder. I know there are plenty of cowboys out there and I should harden the F up and not give them a second thouoght, but this is bugging me. Any advice would be great
He did the first fixings without any problem, and I paid him in full for the first fix.
He then came back to do the second fixings and left some materials onsite he had then added some additional charges to the quote. Even though nothing had been added nor had anything changed from when he had done the original quote. This extra charges were never discussed, nor were they ever explained they were merely hidden in the invoice.
When I called him on this, he agreed to honour his original quote. This then happened a second time after he re-issued the invoice. Just the extra cost were now on different products
He then asked for 50% of the second fix balance upfront before he would proceed with the work. I then asked for a full breakdown what work was to be carried out and what what would be left to do(this included full price breakdown).
When I added everything together I noticed that he had added an extra €2000 to the total price.
When I brought this up with him he couldn't give me an explanation a heated exchange followed.
I then met with him in person to get a full detailed explanation as to the increase and he asked me to ignore it. I couldn't get an answer from him as to why he was constantly trying to increase the cost of the plumbing.
Ultimately I called it off and asked him to remove his materials from the site and looked for another plumber. He then sent me a bill for all the materials he left on site, the value of the materials over the counter at B&Q or any other Building supply is €1500 and he is looking for €2600. So I feel even now he is trying to screw me on this.
I've offered to return the materials and pay for any re-stocking charges. My builder thinks I am mental and that this guy is simply taking advantage because he knows I'm not as hardened as a builder. I know there are plenty of cowboys out there and I should harden the F up and not give them a second thouoght, but this is bugging me. Any advice would be great