Got first price/quote for siteworks to 2000 sq foot house + garage.
The site is fairly level and straightforward at a glance.
Digging out + Stone + Utilities + trench to septic tank = 11,000 (incl materials)
Percolation construction = 3,000
Raft = 13000 (includes concrete 5,000)
total = €27k (including VAT)
how does that compare ?
The site is fairly level and straightforward at a glance.
Digging out + Stone + Utilities + trench to septic tank = 11,000 (incl materials)
Percolation construction = 3,000
Raft = 13000 (includes concrete 5,000)
total = €27k (including VAT)
how does that compare ?