Hi,
I have recently put down a patio and now have to grout it. I have been supplied with Rompox Drain (by Romex) and I am hoping to do the grouting on Saturday (weather depending). I have what is probably a very basic question. I have 3 25Kg bags of rompox with the bottles of chemicals etc. I was going to mix each lot and put it down separately as I do not have anything big enough to mix everything in one go. Is this OK? I will split the patio into 3 sections and try not to go back over an already grouted area with each new mix. Does this make sense?
Thanks
I have recently put down a patio and now have to grout it. I have been supplied with Rompox Drain (by Romex) and I am hoping to do the grouting on Saturday (weather depending). I have what is probably a very basic question. I have 3 25Kg bags of rompox with the bottles of chemicals etc. I was going to mix each lot and put it down separately as I do not have anything big enough to mix everything in one go. Is this OK? I will split the patio into 3 sections and try not to go back over an already grouted area with each new mix. Does this make sense?
Thanks