I’ve done something similar a few times, plumbers have never batted an eye lid.Would any plumber connect into my pipe work if I fit all the rooms with new pipe work and radiators? I would be just leaving the new pipes unconnected in the boiler room?
OSB? I wouldn't be using MDF on a floor, if not fully supported it will sag over time and is prone to significant expansion if exposed to water.He did mention replacing all the floorboards with MDF as the surface area of the downstairs area is ~130 square meters which might work out cheaper but not worth it.
OSB? I wouldn't be using MDF on a floor, if not fully supported it will sag over time and is prone to significant expansion if exposed to water.
The original posters' contractor was suggesting MDF thoughThis appears to be the standard approach now? I had a big leak and the insurance contractors replaced the floorsboards with OSB in the impacted bedroom. It is still sitting on joists, so don't see an issue with sagging to be honest.
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?
We use cookies and similar technologies for the following purposes:
Do you accept cookies and these technologies?