we want to remove an extension at the back of the house kitchen/dining area it has no insulation and the mould and damp are bad. (House has a BER E2 rating) which we are trying to improve ! The extension was built some time ago and was exempt from planning. (Previous owners).
We want to replace like for like (less than 40sqm) and we’re told we did not need planning if this was the case, however if we are removing a planning exempt structure and replacing do we need planning? Thanks