The shed with my new house measures approx 8x10 feet and has a raised concrete floor, roughly 3 or 4 inches off the ground. I want to get rid of the whole lot and plant a lawn. What kind of equipment/time scale am I looking at to dig up the concrete and a crazy paving path leading up to it? Is it a job for a professional or is there a piece of equipment I could hire?