Hi
I heard the going rate around the area I wish to build is 60/70c a block.
I have no idea what this should or does usually include. Basically all I know is that is doesn't include materials and that the block work for the footings is usually a bit less per block.
The build would consist of a standard cavity wall with insulation.
Does the blocklayer employ his own labourer at the 60/70c a block rate?
The house will have a precast concrete 1st floor. (Which I imagine would make things easier for the blocklayer doing the work.)
When it comes to sills, lintels and insulation between the cavity walls would these normally be extra?
Other than the materials and price per block what else should I budget for?
I heard the going rate around the area I wish to build is 60/70c a block.
I have no idea what this should or does usually include. Basically all I know is that is doesn't include materials and that the block work for the footings is usually a bit less per block.
The build would consist of a standard cavity wall with insulation.
Does the blocklayer employ his own labourer at the 60/70c a block rate?
The house will have a precast concrete 1st floor. (Which I imagine would make things easier for the blocklayer doing the work.)
When it comes to sills, lintels and insulation between the cavity walls would these normally be extra?
Other than the materials and price per block what else should I budget for?