hi just wondering how much it cost for plumbers labour only to plumb 3500sft house with ufh downstairs 9 rads upstairs bathroom five ensuites pressurised domestic system solar panels with 500 litre cyl condenseing oil boiler
It is too hard to price without drawings, but you are looking at approx 2 weeks work to 2 people. Electrician about 3 days to wire UFH with stats in all rooms. All works will be spread over the build so a lot of back & forwarding. This would also include oil tank installation, oil pipe, etc.
So, (labour rate x 10 x 2 + electician labour rate x 3) + VAT @ 13.5%