Hi There, I have just moved into a house and need to get the bathroom suites replaced (all pink, yuck) and the bathrooms tiled.
I was given a quote of 5.7k for the job, Labour only!
The job includes changing three toliets, three basins, one bath and one shower tray and tiling the three bathrooms, (one is a downstairs wc, very small tiling job!)
The guy told me that it would take approximately 3 weeks to carry out the job which two man working on it. Surely this is ott. I thought it would take 3 days.
Am I out of touch but to me this seems overpriced too.
I would really appreciate some advise on this.
Thanks
I was given a quote of 5.7k for the job, Labour only!
The job includes changing three toliets, three basins, one bath and one shower tray and tiling the three bathrooms, (one is a downstairs wc, very small tiling job!)
The guy told me that it would take approximately 3 weeks to carry out the job which two man working on it. Surely this is ott. I thought it would take 3 days.
Am I out of touch but to me this seems overpriced too.
I would really appreciate some advise on this.
Thanks