H house Registered User Messages 55 26 Feb 2010 #1 Hi all, Can anyone give an approx coverage rate of a 25kg bag of cement for plastering works in m2 for typical overall thickness of 20, (scud 3mm + scratch 9mm + finish 8mm) and approx tonnes of sand required per m2 for the same build up? Thanks
Hi all, Can anyone give an approx coverage rate of a 25kg bag of cement for plastering works in m2 for typical overall thickness of 20, (scud 3mm + scratch 9mm + finish 8mm) and approx tonnes of sand required per m2 for the same build up? Thanks
C Capt. Beaky Guest 26 Feb 2010 #2 A ton of sand does 40m2 approx. Amount of cement determined by the strength of mix.