What I think are social/affordable housing are already built and occupied as far as I can tell - they are houses designed differently to all the others (kitchen at the front), there's two terraced rows of them. One on The Dale and one on The Court. One of the newly built houses on The Green is already occupied, and some of the others don't look far behind. Six of the other nine now have sold signs up, along with two of the five beds on the other side. Sully, not all the water pipes froze over the winter - ours did, but many of our neighbours we spoke to had no problem at all. For next next phase of building there's PP applied for converting the attic of the 3/4 beds and making that the master bedroom, and having the box room as a study. Also for a conservatory on the houses.