Move from a 1 way pipe system to 2 ways pipe system: help

stella

Registered User
Messages
43
Hi there,

basically I have been told that I am missing a primary return pipe to the Hot press necessary to install the heating controls + new boiler.

The hot press is located in the first floor while the boiler on the ground floor. I have been adviced that they will need to run a pipe underneath the floor to connect the hot press to the boiler...which basically means that they will need to lift the wooden floor to do so.

I am trying to understand if there is another way to do the same job without lifting the floor as it will mean more money with the risk I need to buy a complete new one.

Maybe through the water tank in the attic?

Cheers
Stella
 