I have just started a build and was wondering if it would be worth starting a thread on costs etc.
Foe example I have used fill at the following prices
4 inch down Euro 5 + vat per ton
sub soil euro 3 + vat per down
Digger driver + digger was euro 30 an hour + vat
1.2 ton roller was euro 300 a week inc vat
I am interested in prices for blocks, cement, insulation, labour etc
Foe example I have used fill at the following prices
4 inch down Euro 5 + vat per ton
sub soil euro 3 + vat per down
Digger driver + digger was euro 30 an hour + vat
1.2 ton roller was euro 300 a week inc vat
I am interested in prices for blocks, cement, insulation, labour etc