Just about to pour my finished floor, does any one have advice on what to do around the shower waste in terms of pipe work, should I pour concrete under the shower tray and all round the waste? or leave a space around the waste with wood battens for later access. Or not pour concrete under the shower at all and build up the shower base to the right height?
whats the norm?
whats the norm?