Why don't you get quotes from a number of contractors?
you get a drawing and spec done, arch tech style (biased postHow do I negotiate down so that I don't feel like there is too much profit taking in the larger quote ?
I can understand getting a spec done for Slates,Felt insulation etc. but is there a need for a drawing for what the OP describes as a strip and replace job?you get a drawing and spec done, arch tech style (biased post)
Not to insult anybody but after what I've seen go up during the celtic tiger I've little faith in many of the professionals.
there is something a miss if the quotes areI can understand getting a spec done for Slates,Felt insulation etc. but is there a need for a drawing for what the OP describes as a strip and replace job?