eamonn123456
Registered User
- Messages
- 483
I want to change a single doorway from a kitchen to a dining room to an archway.
Standard height (approx 7ft I guess).
I think I know how this is done, it involves nailing on a expanded metal arch 'form', nailing on beading up the sides, plastering those up with bonding, and skimming it all round.
(I would do the donkey work and remove the old door frame).
How long would it take a plasterer, on his own, to do all this please?
I'm thinking 2 mornings max ?
(assuming he could be bothered with a small job)
Standard height (approx 7ft I guess).
I think I know how this is done, it involves nailing on a expanded metal arch 'form', nailing on beading up the sides, plastering those up with bonding, and skimming it all round.
(I would do the donkey work and remove the old door frame).
How long would it take a plasterer, on his own, to do all this please?
I'm thinking 2 mornings max ?
(assuming he could be bothered with a small job)