Sent rough measurements with floor plans and elevations etc to 6 or 7 of the main suppliers after researching previous threads and key posts here.
Drawings, measurements and requirements were sent by email over a week ago.
Only company to revert so far said the factory in Denmark was down one or two people at the moment but they are trying to get a quote as soon as they can.
Is this normal or just a bad time of year (with Scandanavian region now on hols for the next few weeks) or a bad year to get windows replaced with all of the SSIA money slushing about the place?
Dont want to rush into anything for the sake of getting it done and as the windows arent exactly falling outif there is a better time of year to do this or if I should wait til things are quieter thats no problem.
Drawings, measurements and requirements were sent by email over a week ago.
Only company to revert so far said the factory in Denmark was down one or two people at the moment but they are trying to get a quote as soon as they can.
Is this normal or just a bad time of year (with Scandanavian region now on hols for the next few weeks) or a bad year to get windows replaced with all of the SSIA money slushing about the place?
Dont want to rush into anything for the sake of getting it done and as the windows arent exactly falling outif there is a better time of year to do this or if I should wait til things are quieter thats no problem.