HI,
We are just starting a self build, and are at the foundation stage. The following will be the foundation makeup, 150mm hardcore, 150mm concrete, 175mm insulation, 50-75mm screed with ufh pipes. (50mm if easy screed, 75mm if sand and cement).
I was wondering where the waste water pipes should go in the foundation, our builder was talking about putting them in with the insulation, but I thought that would slightly defeat the purpose of the insulation as the part of the floor with the pipe will have about 100mm less of insulation. Basically am just looking for advice on whether the sewer pipes should be in the subfloor or is it ok to put in with the insulation. They are working on the footings at the moment so need to resolve this asap.
Thanks for any advice
We are just starting a self build, and are at the foundation stage. The following will be the foundation makeup, 150mm hardcore, 150mm concrete, 175mm insulation, 50-75mm screed with ufh pipes. (50mm if easy screed, 75mm if sand and cement).
I was wondering where the waste water pipes should go in the foundation, our builder was talking about putting them in with the insulation, but I thought that would slightly defeat the purpose of the insulation as the part of the floor with the pipe will have about 100mm less of insulation. Basically am just looking for advice on whether the sewer pipes should be in the subfloor or is it ok to put in with the insulation. They are working on the footings at the moment so need to resolve this asap.
Thanks for any advice