Finished floors..
Not interested in the easy screed type of floor so have two options
Option one Concrete mixer and pump
I have done this before with underfloor heating and find the heating works well, although when it went down it wasn't done perfectly level.
rough costs
€2250 concrete 30 m (mix with small 10mm smooth stone)
€800 pump hire (one day)
€1800 labour (2 days? 4-6 lads one floor a day)
€4850 total
Option two sand cement and smaller pump
some recon its better for underfloor, comes with his mixer and pump, 3 lads they mix on site and pump in, advantage is they do it at there own pace so will get it right first time.
rough cost
€2200 cement bags (no stone) and sand
€3500 labour
€5700 total cost
There's a bit in the price but does any one know which way is best to go?