Hello,
I'm getting electrics done for an extension - not built yet but getting there. Rather than changing the switch board at the front hall to take the extra wiring, can one bring a cable from the main board and put a second board in the extension and run everything off that. Or is there an official way of doing it by the book. Also, can I run a cable from the main board on the wall outside the perimeter of the house to the extension - so that we're not pulling the house asunder to get the cable to the extension.
Not doing it myself, just want to know what's allowed.
Thanks