Hi!
I am paying an Engineer a 'significant' amount of money to come out to my site six times during the build to ensure everything is being done properly.
Should I expect feedback from him after each visit? If so, in what format? A phonecall? Report?
I heard from him over the phone during the first visit where he was giving out because there was a problem and it was taking up a lot of his time. Following the second visit, he didn't even phone me. I had to phone him a week later to see how it went. I certainly got the impression that he had made up his time from the first visit. I wonder if he just jumped over the gate and ran around the house. There were a number of things that I brought up with him that he hadn't even noticed.
Pudzer
I am paying an Engineer a 'significant' amount of money to come out to my site six times during the build to ensure everything is being done properly.
Should I expect feedback from him after each visit? If so, in what format? A phonecall? Report?
I heard from him over the phone during the first visit where he was giving out because there was a problem and it was taking up a lot of his time. Following the second visit, he didn't even phone me. I had to phone him a week later to see how it went. I certainly got the impression that he had made up his time from the first visit. I wonder if he just jumped over the gate and ran around the house. There were a number of things that I brought up with him that he hadn't even noticed.