Hi, our scaffolding cost €4,800 for erection and dismantle for 6 weeks and I think €300 per week after that but there will always be problems, we got delayed by brick layer, we have a timber frame so didn't needed it for as long. If I was doing a full brick house I would buy the scaffolding. They kept firing bills at us for fixing the scaffolding due to safety regulation checks without even telling us so we didn't even know if the scaffolding was moved and then the slater kept delaying us so, so as soon as he was finished we just told the scaffolding man to take it down because the costs were spiralling, which didn't please the soffit and fascia man!!