We received an original quote of 15,000 euro to plaster and paint (PCcosts) a 1750sqft house with high ceilings (victorian house), includes walls and ceilings.
Upon removing wallpaper and doing preliminary works was discovered that most internal walls the plaster needed to be stripped and new plasterboard was used on. Most celings were also removed.
We are paying extra for the labor to remove these walls and ceilings. Also paid extra for new plasterboard and materials and labor to replace walls/ceilings.
I would appreciate any advice regarding the original quoted price and also should this original 15keuro change now that we have replaced most walls and ceilings with new plasterboard. Is skimming cheaper than plastering the original walls?
Thanks
We received an original quote of 15,000 euro to plaster and paint (PCcosts) a 1750sqft house with high ceilings (victorian house), includes walls and ceilings.
Upon removing wallpaper and doing preliminary works was discovered that most internal walls the plaster needed to be stripped and new plasterboard was used on. Most celings were also removed.
We are paying extra for the labor to remove these walls and ceilings. Also paid extra for new plasterboard and materials and labor to replace walls/ceilings.
I would appreciate any advice regarding the original quoted price and also should this original 15keuro change now that we have replaced most walls and ceilings with new plasterboard. Is skimming cheaper than plastering the original walls?
Thanks
Last edited by a moderator: