I have been granted retrospective planning permission for my driveway.
It is now a case of getting a builder with liabilty insurance to carry out the dip to the kerb.
I have been quoted €800. The builder is saying 3 men taking 2 days. There are 3 driveways (ie. 3 houses) that need to be done. Is this a realistic figure? He would be cutting into the council's existing concrete footpath and creating the dip dimesions approx 1m x 3.5m