Concrete floor drying time

slave1

Registered User
Messages
243
Hi all,

Long time viewer, first time threader

Recently added porch to front of house, sorta west facing getting a lot of afternoon/evening sun. About 7 sq yards and floor about 3-4 inches deep. Down two weeks now and waiting to lay porcelain tiles. Considering the weather we've been having lately does anyone have a good idea on how long to leave this floor drying before I can lay the tiles - and complete the job.

Any informed thoughts welcomed
 
probably not so important as you are tiling, the problems start when putting down timber - esp. solid. Might be no harm to get a small dehumidifier to take a bit of the water out as still quite fresh. Leave windows slightly open to let the evapourated moisture out.

No great worry for you as tiling & going to be wetting the floor to some extent again
 
Back
Top