TLDR: Recently purchased a Detached House, built 2001, UFCH both floors, currently C1 potential BER A3. What order do I work through things and can I avoid dealing with many different professionals?
Opinions/advice on the following:
So, heating priorities first should I just focus on getting a plumber to deal with the basics (expansion vessel, PRV) or work to upgrade the whole system? (Stats, controls, manifolds etc)
Or should I just look into an a heat pump and UFCH upgrade at the same time. Not sure that's a good path until I've addressed the windows/doors and attic U values.
Should I ditch the solar stuff until the above is done?
Been looking at SEAI approved contractors and not confident that those listed can deal with most if not all of the above. Ideally a one stop shop (after several quotes from same) would be great but maybe that's a pipedream.
Happy to be quizzed or admonished, let me know what you from experience would do.
Opinions/advice on the following:
- UFCH: Installed when house was built (ancient). Newish oil condensing boiler, loops are heating up, but the whole system needs upgrading. (Mainfolds, thermostats, pressure test, flushing etc) The expansion vessel has no pressure, and the relief valve in the boiler has been venting. Room stats, controls need upgrading as they are ancient like the rest of the system.
- As UFCH throughout suited for an upgrade to a Air-Water heatpump but also need doors/windows/attic insulation work as part of the BER report. The walls have rock wool insulation behind the plasterboard against the blocks)
- Windows double-glazed but need upgrading U values wise (Substantial amount of windows)
- The doors need updating to higher U values.
- I want to install Solar panels/battery and eventually an EV wall charger.
So, heating priorities first should I just focus on getting a plumber to deal with the basics (expansion vessel, PRV) or work to upgrade the whole system? (Stats, controls, manifolds etc)
Or should I just look into an a heat pump and UFCH upgrade at the same time. Not sure that's a good path until I've addressed the windows/doors and attic U values.
Should I ditch the solar stuff until the above is done?
Been looking at SEAI approved contractors and not confident that those listed can deal with most if not all of the above. Ideally a one stop shop (after several quotes from same) would be great but maybe that's a pipedream.
Happy to be quizzed or admonished, let me know what you from experience would do.