Hi,
A friend of mine is having a house built with the first blocks laid today. Unfortunately, the rain started and the blocklayers had to stop work. The cement between the blocks that have been laid has been partially washed away. Should he make the builder start again or can this be repaired?
Thanks,
Herbie