I received planning permission for a 600 sq/ft extension and sent it out to tender (in a tender pack) with planning drawings and a detailed building specification (prepared by our architect, don't have working drawings). I sent it out to 4 contractors and 3 came back roughly the same price but one contractor came back 10k cheaper. It's great to get the lower price and justifies the tendering process but am also a bit wary that there is such a difference in price. I plan to have a look at his existing projects, references, PI insurance etc but is there anything else I should be checking?
Thanks.