Hi all,
The post about surveying has prompted me to ask this question. If I am interested in a site, should I have my engineer look at it previuos to me making a bid or should I wait until it has been sale agreed before forking out the moeny for him? I am thinking I should wait until its sale agreed? I assume my enginner will check the drainage and all that on the site
The post about surveying has prompted me to ask this question. If I am interested in a site, should I have my engineer look at it previuos to me making a bid or should I wait until it has been sale agreed before forking out the moeny for him? I am thinking I should wait until its sale agreed? I assume my enginner will check the drainage and all that on the site